World Bank: Red-Dead pipeline is feasible

17.01.2013                      06.Schwat. 5773

Umwelt & Technologie:

World Bank: Red-Dead pipeline is feasible

Project connecting the two seas would be an environmental disaster, green activists warn.

While there may be environmental and social impacts on the region, a trilateral plan to construct a 180-kilometer pipeline transporting water from the Red Sea to the Dead Sea is feasible, a World Bank study has determined….